Bathroom Remodel — Tub Surround & Tile

The before photo is the middle of the job, which is the honest place to start: tub surround stripped to the studs, a new tub already set, cement board down on the floor, and the toilet flange open — the moment when a bathroom is nothing but framing and rough plumbing.

From there it was rebuilt as a clean tub-shower: large-format gray subway tile run floor to ceiling around the tub over the cement board that went in while the walls were open, brushed nickel fixtures, and a new large-tile floor.

Before

After

Related Services

← Back to the project gallery

Call Now Free Estimate